Pangyo Residence
- Phase : Completed
- Design Period : 2014.6~2015.3
- Construction Period : 2015.4~11
- Location : Pangyo, Seongnam-si, Gyounggi-do, Korea
Thanks to all participants in the project.
- Phase : Completed
- Design Period : 2014.6~2015.3
- Construction Period : 2015.4~11
- Location : Pangyo, Seongnam-si, Gyounggi-do, Korea
Thanks to all participants in the project.
서울특별시 서초구 신반포로 45길 9-22, 천우빌딩 5층 T. 02-2043-9077 F. 02-2043-9377 ⓒJEOH ARCHITECTS ALL RIGHTS RESERVED.